ACCI · ACCI main hall, Abuja · September 2026

Eight cameras in a 32 by 62 metre hall

A special Sunday service with eight camera positions, four picture surfaces, two consoles and a bonded uplink to YouTube. Every cable was drawn, measured and counted against the pool before a single reel was unrolled.

Hall
32 × 62 m, gallery deck at 3.2 m
Cameras
8, including 3 rovers and a crane
Screens
LED wall 18 × 3 m, two 4 × 3 m, six 55 inch TVs in three bays
Signal
Fibre HDMI trunks, ATEM program, timer feed
Uplink
Bonded cellular, YouTube
Deliverable
14-page technical plan, 3D sheets, cable register, interactive planner
01

Survey

Walk the hall, measure what the drawings do not show.

The gallery turned out to have 2.9 metres of clear height, which killed one of the planned 4 by 3 metre screens. It was replaced with six 55 inch TVs in three bays, chained on 20 metre fibre hops, and the whole plan re-rendered from the new numbers in an afternoon.

02

Draw

Every run in the building, in three dimensions, with the cable budget on the same sheet.

The drawings are generated from one data file that holds the hall geometry and every cable run with its length. Change a number and every drawing and the cable register update together, so the crew rigs from the same picture the plan was costed on.

Screens and the long cable runs, three-dimensional view
Screens and the long cable runs, three-dimensional view
Camera positions and the runs back to the console
Camera positions and the runs back to the console
03

Build

Saturday evening: the wall on its truss, flashed green to check every panel before the content goes on.

Panel test, 12 September, 19:14muted · loops
04

On air

Screens live before dawn, eight cameras switched and streamed on a bonded uplink.

Service photos and stream stills to follow